L-T-80C
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be level A or C as specified in
accordance with the applicable requirements of PPP-T-680 or as specified in the contract or purchase order
(see 6.2). When packaging of materiel is to be performed by DoD or in-house contractor personnel, these
personnel need to contact the responsible packaging activity to ascertain packaging requirements.
Packaging requirements are maintained by the Inventory Control Point's packaging activities within the
Military Service or Defense Agency, or within the military service's system commands. Packaging data
retrieval is available from the managing Military Department's or Defense Agency's automated packaging
files, CD-ROM products, or by contacting the responsible packaging activity.
5.2 Packing. Packing shall be level A, B, or C as specified in accordance with the applicable requirements
of PPP-T-680 or as specified in the contract or purchase order (see 6.2).
6. NOTES
INFORMATION FOR GUIDANCE ONLY. (This section contains information of a general or
explanatory nature that is helpful, but is not mandatory.)
6.1 Intended use.
6.1.1 Type I. This tape is intended for use in sealing applications where the properties of good weather
resistance, reflectivity, and water vapor transmission resistance are required. Type I has no release liner
covering the adhesive.
6.1.2 Type II. This tape is intended for use in sealing applications where the properties of good weather
resistance, reflectivity, and water vapor transmission resistance are required. Type II shall have a
release liner covering the adhesive.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a) Title, number, and date of this specification.
b) Types (see 1.2)
c) Materials to be used, if required (see 3.1).
d) Length of tape required, with tolerance, if other than 60-yard minimum length roll (see 3.3.1).
e) Width of tape required (see 3.3.2).
f) Requirement for suitability for use with explosives when required (see 3.4).
g) If someone other than the contractor is responsible for the performance of all inspection
requirements (examinations and tests) (see 4.2).
h) If the contractor cannot use his own or any other facilities suitable for the performance of the
inspection requirements (see 4.2).
i) If equivalent in-process inspection is to be substituted (see 4.2.1).
j) If packaging is different (see 5.1).
k) If packing is different (see 5.2)
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business