MIL-PRF-8516G
4.3 Qualification inspection. Qualification inspection shall consist of all the tests specified
in table III.
TABLE III. Qualification inspection.
Characteristic
Requirement
Test paragraph
paragraph
Material
3.2
4.9.1
Color
3.3.1.1
4.9.1
Consistency during potting operations
3.3.1.2
4.6.1.3
Application life, initial viscosity
3.3.1.3.1
4.9.2.1
Application life, application time
3.3.1.3.2
4.9.2.1
Nonvolatile content
3.3.1.4
4.9.2.2
Set time
Table I
4.9.2.3
Shrinkage
Table I
4.9.2.4
Hardness
Table I
4.9.2.5
Adhesion
Table I
4.9.2.6
Fluid resistance
Table I
4.9.2.7
Low temperature flexibility
Table I
4.9.2.8
Corrosion
Table I
4.9.2.9
Hydrolytic stability, physical
Table I
4.9.2.10
Accelerated storage
3.3.1.5
4.9.2.11
Long-term storage
3.3.1.6
4.9.2.12
Arc resistance
Table II
4.9.3.1
Dielectric strength
Table II
4.9.3.2
Dielectric constant
Table II
4.9.3.3
Dissipation factor
Table II
4.9.3.3
Volume resistivity
Table II
4.9.3.4
Surface resistivity
Table II
4.9.3.4
Insulation resistance, as received
Table II
4.9.3.5
Insulation resistance, after thermal shock
Table II
4.9.3.6
Insulation resistance, after hydrolytic stability
Table II
4.9.3.7
High potential resistance
Table II
4.9.3.8
Air leakage
Table II
4.9.3.9
Overload
Table II
4.9.3.10
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business